Match the storage voltage to the PV plant.
800VacDirect AC coupling
1500VdcUtility-scale battery side
Why force a 690Vac storage branch into an 800Vac PV plant?
An extra transformer appears
Lower voltage means higher current
Centralized DC paralleling adds coupling
Same PV plant. One storage transformer disappears.
Benefits you can see in the single-line diagram.
Remove the dedicated ESS transformer
Reduce current at the same MW level
Shorten the bidirectional power path
One battery cluster. One PCS. Independent control.
The 250kW / 800Vac building block
One PCS platform. Two distinct operating modes.
PQ control
VSG / VF control
Use the right mode
250kW modules. Three cabinet sizes. A scalable system.
4 × 250kW PCS
Dimensions (W × H × D) 1400 × 2260 × 850 mm
Reference weight 950 kg
6 × 250kW PCS
Dimensions (W × H × D) 1900 × 2260 × 850 mm
Reference weight 1.3 t
8 × 250kW PCS
Dimensions (W × H × D) 2464 × 2260 × 850 mm
Reference weight 1.7 t
One repeatable power building block · from battery cluster to PV plant
Battery cluster + 250kW PCS
C4 / C6 / C8
800Vac PV AC bus
690Vac adaptation vs 800Vac direct coupling.
| Item | Option A · 690Vac PCS | Option B · 800Vac PCS |
|---|---|---|
| ESS PCS AC voltage | 690Vac | 800Vac |
| Dedicated ESS voltage-matching transformer | Required | Not required |
| ESS branch major assets | Battery + PCS + transformer | Battery + PCS |
| Charging path | 800Vac bus → transformer → PCS → battery | 800Vac bus → PCS → battery |
| Discharging path | Battery → PCS → transformer → 800Vac bus | Battery → PCS → 800Vac bus |
| Additional transformer loss point | Present | Removed from ESS branch |
| Installation / commissioning scope | Higher | Lower |
| Topology simplicity | Lower | Higher |
Questions that come up before the SLD is frozen.
Can the 800Vac PCS connect directly to the PV plant 800Vac bus?
Yes, this is the core use case of the 800Vac configuration. The PCS AC side is designed to match the plant’s 800Vac voltage domain, so the dedicated 690/800Vac ESS matching transformer can be removed where the project protection and grid-connection design allow direct coupling.
What are the standard 800Vac modular cabinet sizes?
C4, C6 and C8 house four, six and eight 250kW EPCS250-AM-HX modules, yielding rated cabinet powers of 1MW, 1.5MW and 2MW. The approved cabinet specification lists IP55 housing and IP66 PCS modules; verify integration, protection and final mechanical design for each project.
Does the project still need the main 800Vac-to-MV transformer?
Yes. The solution removes the additional transformer in the ESS branch. The common plant step-up transformer to 10kV / 35kV remains part of the grid-connection path.
Why use a string PCS architecture instead of one centralized PCS?
With one PCS per battery cluster, clusters remain electrically decoupled on the DC side and can be regulated independently. That reduces the coupling between battery clusters and supports modular fault isolation and expansion.
Do the animated charging and discharging paths represent product switching time?
No. The SLD particle animation is an engineering illustration, not a real-time response or changeover test. Charge/discharge response and transition times must be confirmed from the applicable technical specification and project control strategy.
How does the PCS operate when grid-connected and off-grid?
When grid-connected, the PCS operates in PQ mode with active and reactive power dispatch. In a suitably engineered off-grid system, it supports VSG / VF mode for islanded AC-bus voltage and frequency regulation. Grid-connected VSG operation is not supported in the current product scope.